Our products for professionals
Because each project is unique!
CAMPING SANITATION
Particularities to take into account:
- Frequency and seasonality of the production = variation in effluents volumes.
- Downstreams protection (pumps,…) non-biodegradable wastes such as wipes, plastic bottles…
- Differentiate between transit areas (tent, caravan = 1,5 EH) and residentials areas (mobil-home = 2EH).
HOTEL SANITATION
Particularities to take into account:
- Frequency and seasonality of the production.
- Summer activities that often lead to significant costs in a few days.
CUTTING AND PROCESSING ACTIVITIES SANITATION
Particularities to take into account:
- Frequency and seasonality of the production = variation in effluents volumes.
- Effluents analysis campaign.
- Blood séparation.
- Significant presence of greases.
CHEESE PROCESSING SANITATION
Particularities to take into account:
- Frequency and seasonality of the production = variation in effluents volumes.
- Effluents analysis campaign.
- Significant presence of greases.
RESTAURANT SANITATION
Particularities to take into account:
- Frequency and seasonality of the production = variation in effluents volumes.
- Increasingly oily water spills.
- Possible presence of nitrates.
BREWERIE AND MICROBRAWERIE SANITATION
Particularities to take into account:
- Frequency and seasonality of the production = variation in effluents volumes.
- Very heavy effluents.
- Ratio volume of beer brewed/organic load
WINE SANITATION
Particularities to take into account:
- Frequency and seasonality (according to events) of the production = variation in effluents volumes.
- Peak demand during grape harvests.
- Possible lack of nutrients.
With more than 100 000 professionals sewage plants set we securise your projects with
Camping sanitation
Semi-industrial and industrial sanitation
Hotel sanitation
Requirements specification
- Nature of the activity.
- Possible seasonality.
- Present and future situation.
- Effluent type.
- Level of reject asked for.
- Site – specific constraints.
- Special requests.
R & D
- Feasibilty study
- Recommendations
- Calculations note
- Conception
- Setting up
- Pre – Project
Quotation
- Technical report.
- Schematic diagram.
- Quote.
Acceptation Validation
- Actions planification
- Industrialisation (Manufacturing)
- Delivery
- Installation
- Starting up
- Formation
Exploitation
- Monitoring
- Periodicals visits
- Maintenance
- Analysis
- Optimisation